Next Week21 Jun 2024 07:46
It is then, for Gas flows , very happy they are taking the time required, safety at this stage is of critical importance
as i discussed with David Neuhauser at the AGM, we don't need any Hic-Ups at this stage of the game,
he agreed entirely that the plant should be brought into production with safety being the focus of attention, if it takes an extra week or two so be it, this plant will be functioning for years to come,
every joint-flange -connection and weld needs to be checked for integrity most of this has already been done,
once we switch it on !!!, it becomes 24 hour 7 days a week operation, lots of moving parts, with gas sales &Liquid sales to control, we must ensure the logistics are in place to take the valuable liquids away from the plant,
the early months of production will be liquid intensive, until the gas flows settle down.