RE: No water cut7 Dec 2023 18:29
As said before, it will take time for the clean up to finish and the flow to stabilise. Only then will the Esp be installed, but from what is said below I have no doubts that time will come.
"As previously announced, the SCHB-2(2.) well has encountered an excellent 34-metre gross interval containing 28 metres of oil-bearing net reservoirs in the Pechelbronner-Schichten ("PBS") sandstones within the Stockstadt Mitte segment of the Erfelden field.
· These oil-bearing reservoirs were encountered approximately 25 metres high and 10 metres thicker than prognosis, with porosities averaging 18% in the Lower PBS and 21% in the Upper PBS, with no water-bearing sands in the 42m hydrocarbon column"
The chairman has said previously if we get 250bopd we will be self funding for FFD 600 was the aim which he said would enable it to be faster. Now they talk of 900bopd plus.
Been here a while under the old company and sticking around for that FFD as that will be the bigger long term profits. Has to worth a punt for newbies at this price even for a short term gain.
I'm thinking .2 plus when stabilised then .3 to .5 with ESP installation so plenty of upturn from here by mid first qtr. Then with FFD we should be climbing up into the pennies.
Good luck to all, but DYOR