RE: Drilling timeline13 Nov 2025 15:10
As at the end of October 2025, 1,340m of drilling has been completed in 10 drill holes and 572 samples have been delivered to ALS Laboratories in Santiago for geochemical analysis. Assay results are pending. Logging, processing and sampling of core is on-going in conjunction with geological interpretation and modelling of the Mostaza Cu-Ag deposit.
572 samples have been delivered to the lab, will probably get these all at once...these were delivered two weeks ago.
We are in the hands of the lab