RE: Testing timescales6 Jun 2018 09:49
The RNS is ambiguous. Is it within 60 days from the start of testing or from the RNS?
Extended well stimulation and testing program commenced on 8 April 2018. 6m (3m of Zone 14 and 3m of Zone 15) out of the identified 98.9m combined pay interval from Zones 9, 14 and 15 of the Eldari reservoir has been perforated, mechanically stimulated and flowed together. The well naturally flowed light, sweet crude oil at a stabilised flow rate of 270 bbls per day. The intention is to continue to test the combined flow of Zones 14 and 15 and, within a period of approximately 60 days, perforate and stimulate Zone 9 and produce from all zones together.