RE: New drilling26 Mar 2024 19:39
It is expected to take 4 - 6 weeks id say. The previous drill was hampered by extremely cold weather(snow), equipment breakdowns and then the unexpected influx of high pressure hydrocarbon which took them a bit of time to get under control. They then decided to drill a bit deeper so these were all things that added additional time.
H&P will have a lot of detail from the previous drill so should be much more efficient.