"Based on an initial review of the preliminary results of the draft Scoping Study, Anglesey has asked both Micon and Fairport to consider alternative production and throughput scenarios, at various levels between 500 and 1,000 tonnes per day, and expects to receive modified mine production schedules and alternative capital cost estimates in the near future. The inputs will then be incorporated into updated financial models, with a view to having optimized development scenarios available for consideration before the end of June 2017."
Sounds like options are going to be available but potentially not published?