RE: Lots of words19 Dec 2025 08:07
For me, this is probably the most important line in the RNS:
"The Desert Scheelite Mineral Resource cutโoff grade of 0.06% WOโ was selected by the authors. Operating assumptions were applied to establish a theoretical pit limit, including a WOโ price of $65,500/t, an average recovery of 80% WOโ, a processing rate of 4,000 tonnes/day, $2.75/t mining cost for open pit, $15.64/t processing cost, $3.00/t processed for G&A, and an 83% payability. Blocks outside the pit limit are not considered to be economic at this time."