RE: The major12 Oct 2018 13:05
Yes, the project is already advanced with 5 wells drilled in the basin and all the technical data, logs, rock cores tied back to the 3D and 2D data giving a live geological model. The TOC oil type, source, porosiy, permeability, seals, and play types are all known from the wells drilled. To do this work again would cost in excess of $500m. BPC own all this data, so the licences cannot be drilled without it.