News near term - this month3 Feb 2019 09:45
In February 2019, Attis will mobilise equipment and personnel to the Austin Field in order to begin to test fluid flow and origin, service and/or replace downhole equipment, service topside equipment, and, revitalise production at the Montsanko #1 and Morris #1 wells.
The newly acquired Montsanko #1 well is understood to be a high fluid volume production well. Our plan is to conduct a production test, analyse the oil/water entry ratio and replace the existing electric pump with a pump-jack. Its our belief that this should increase production efficiency whilst still allowing the integration of existing infrastructure.
We plan to conduct testing and rework on the Morris #1 well, including integrity testing and likely replacing the downhole pump. The Morris #1 well has production separation units and fluid storage tanks available.
___________________________________________
....probably less important now, any negotiated settlement for Forest Hill - hopefully Mayan can recover some of its ill advised costs of this investment.
_____________________________________________
And lastly Petroteq (Zinc Ranch operations being later in H1 per RNS) - the valuation comment in the RNS suggests PQE news must be due soon - well they are way behind on 1,000 bopd target so confirmation of that expected to kick start their recovery. Plus quite sizeable shorts have been closed this last week - there is always someone one step ahead.