RE: Video conference27 Nov 2024 16:39
Kenmares production is dropping off the edge they will be mining mud in 6-9mnths cut off point 2.1-2.2%
Q3 2024 Q3 2023
tonnes tonnes % variance tonnes
Excavated ore1 11,089,000 10,822,000
Grade1 3.80% 4.32%
Production
HMC production 355,400 414,600 -
HMC processed 356,000 412,900 -
Ilmenite 257,400 291,200 -
Primary zircon 14,600 14,100
Rutile 2,900 2,700 7%
Concentrates2 13,500 14,700
Shipments 302,700 163,400