RE: the drill ship is the key short term.15 Dec 2019 11:35
The work will comprise three boreholes, each with cone penetration testing (continuous PCPT), and is a necessary prerequisite to COSL drilling the NJOM-3 well in line with the LOI which has already been signed with COSL as disclosed in August 2019. The cost of the survey is in line with the budget previously anticipated, and the time required for the work is approximately 7-10 days on site, plus any off-site testing and report preparation.
This will be the final operational step before commencing drilling operations at Njonji.
Ashers plan to farm out the Camaroon License to pay remaining drill costs AND retain a majority
interest will then unfold. NPV of the Camaroon discovery (after dev costs which will be funded via reserve based lending) is c$180m. Our retained share is around £72m.
Then there is the 27,000 acre Prime Namibian block in the Northern Walvis basin.
Tower are surrounded by Exxon and Asher has been in discussions re a farm out for
the last 4 months. We are due to hear something soon.
Lastly we have a 50/50 JV with new age in South Africa in the Outinika basin where Total
have recently discovered 1BN bbl of condensate. Reprocessing of the 2d and 3d seismic
has just been completed.
There is plenty of fuel in the tank once this takes off.
Cameroon will get us to over 1p. Namibian farm out
and news on SA and it will be multiples.
CEO and Chair Jeremy Asher has recently doubled his
position to 27% (12th Nov) which is a very confident
move.