RE: Timing30 Mar 2021 19:15
The POSP ?has since been started and is processing ore. As at the close of business on January 22, 2021, the POSP had ?produced over 150 barrels of net oil in solvent. The Company is now in the process of optimizing plant operating ?parameters to meet oil product specifications and optimize solvent usage and recovery. This phase is expected to ?last a couple of weeks. Thereafter, initial continuous production is expected to begin with a single, 12-hour shift targeting 250 ?bpd and ramping up in the event a second shift can be added.
This from the last petroteq RNS,
I would be quite happy to wait if news was released saying we have been on two shifts for the last few weeks producing 500 bopd , than an early RNS saying we had delays.
Get it right first time dont have to do it a second time