RE: AME Announcement29 Jul 2020 18:11
From the RNS of 23/07:
The Basur discovery, made in 1964, whose primary target was the shallow Cretaceous age Garzan reefal limestones, recovered 600 bbl of oil to surface from deeper naturally-fractured and dolomitised Cretaceous Mardin limestones. Core and cuttings contained live oil. Of the oil to surface, 500 bbl were produced over a 6-hour test period, equating to an extrapolated rate of 2,000 barrels of oil per day ("bopd").
Similarly, wells drilled in the 1950s at Resan originally targeted the overlying shallower Garzan but found good oil shows within the Mardin, although short tests were inconclusive. As the Mardin's natural fracture potential was largely unrecognised at the time, it is AME's and the Company's view that the Resan wells were not adequately tested.