RE: Master plan11 Apr 2023 21:16
Due to the nature of the activity and the dimensions of the machinery to be used, the construction or operation of storage areas for the deposit of material will not be required, he adds.
"As a prevention and mitigation measure, metal-built pools will be used, which will function to receive the material and moisture, thus avoiding the spillage of any material on the natural soil," Bacanora Chemco details.