RE: RNS3 Mar 2026 18:26
Stock genius, the plant has been designed for modularisation, except for the ball mill, heavy lift requirement is limited, as most modules are being moved by road, or container, lifting requirements shouldn't exceed 30 Mts (if not less), only limited if extended reach is required, I'm sure if they planned it right, extended reach isnt. also we don't know what piles are required, We do know that the soil their is based on igneous rock and it looks like rafts are being used for bases, rather than major piling. we don't know what size the piles are. are 300 mm by 10 metres ore 900 mm by 30 metres, the geology suggested closer to the former than than the latter, but their is no data other than that. the RNS did state that the finding on soil surveys for the TSF were conducive to successful and timel y completion of the TSF "Material excavated from the box cut has undergone compaction testing by SRK and has been confirmed as suitable for construction of the 14-hectare TSF starter wall, supporting both the first and second TSF compartments. This outcome provides a positive cost and schedule advantage through the utilisation of on-site materials."