This was just posted on the UKOG site From the RNS. In line with the challenging oil price environment, significant further efforts have also been made in managing and reducing operational costs. From January 2020 to January 2021 our total operating costs have reduced by 66%. The savings will help place Horse Hill in a good position to take advantage of the strengthening Brent crude prices seen in the past month.
Rob , from memory its costing $15 a barrel to extract. A lot of work has been undertaken over the Summer to increase production. Lets hope it has worked. ATB