Ram Head is a gas discovery already23 Jan 2020 18:08
Wireline neutron-density logs show a gas effect over a gross Middle and Upper Jurassic interval of 270 feet in discovery well 49/19-1, drilled by Marathon in 1984/5, with about 80 feet of potentially productive sand. The potential gross gas column could reach 400 feet. This was not tested at the time in 1984 because there was no commercial incentive for Marathon. Marathon's Kinsale Gas Field fully catered for the Irish gas demand and there was no interconnectors with the UK for export.
NuTech detailed petrophysical evaluation of these gas reservoirs using "Shale Vision" and "Thin Bed Vision Analysis with Fracture Intensity Vision" software highlighted missed reservoir "sweet spots" with average permeability of 56 mD and capable of producing hydrocarbons at good rates.