Copper Project Potential Value13 May 2020 09:26
I’d not looked into this project much as it’s obviously a bit off production but are my fag packet calcs right below:
Based on the non-JORC 10Mt Cu,
10Mt @ 0.6% = 60k t
60k t = 132,277,368lb
132,277,368lb x $2.35/lb = $310,851,815
$310,851,815 x 50% = $155,425,907 to AAU
Obviously the resource needs some proving up but if those calcs are correct, adding an asset of that magnitude for an expenditure of on €4.9m is some great work by the BoD.