RE: Malcy29 Jan 2026 13:37
We do know we have a framework agreement with Enbridge, that much has been revealed.
Here's a revolutionary thought - perhaps the problem might not be Zephyr, it could be the parties we are dealing with.
For example in the last RNS:
' As detailed by the framework agreement, Enbridge will construct, own, operate, and maintain the interconnect facilities. The operations being conducted by Enbridge include survey, engineering, environmental, land and right-of-way work, as well as the design, inspection and obtaining regulatory approvals required to run bi-directional flows on the existing Enbridge pipeline. Zephyr will update shareholders on Enbridge's timing as their operational and regulatory processes advance.'
That does not sound like a quick process to me.