RE: sig upside vs minimal downside11 Apr 2018 23:43
Urraca,
Absolutely, you have every right. Free board.
My comment was a general one, no specific names mentioned.
TBH, if we get VOBM#1 side-track done successfully with good Flow rates from the Lower Zone, similar to the ones they achieved during the test after increasing well choke size to 22/64, then I see this going back to 45p in real quick time as it can be connected to the Morgan Kinder plant with considerable ease. Upper producing zone is already connected to the plant.
IMHO.