RNS - Total JORC Resources at Mbe increased to 1.23 million oz contained gold13 Apr 2026 07:05
Oriole Resources PLC (AIM: ORR), the AIM quoted gold exploration and development company focused on Central and West Africa, is pleased to publish the maiden JORC Mineral Resource Estimate ('MRE') for the MB01-N deposit at its 50%[1] owned Mbe orogenic gold project ("Mbe" or the "Project") in Cameroon. Together with the MRE for the neighbouring MB01-S deposit, which was published in Q4-2025, the total JORC Inferred Resource at Mbe is now 1.23 million oz contained gold ("Au").
Highlights
· Independent consultant Forge International Limited ("Forge") has produced a pit constrained Inferred MRE for MB01-N of 10.5Mt at a grade of 1.05g/t for 360,000oz contained gold, using a US$3,200/oz gold price and a lower cut-off grade of 0.40g/t Au.
· The MRE extends over a strike length of approximately 723m, a width of up to 125m, a maximum vertical depth of 270m and remains open in all directions.
· Combined with the existing Inferred Resource at MB01-S (870,000oz), located 700m to the southwest of MB01-N, Mbe now has a total Inferred Resource of 1.23 million oz contained Au, with both deposits remaining open in all directions and with further potential satellite targets within the wider licence area.
· A ten hole 2,500m step out diamond drilling programme at MB01-S commenced earlier this month, with the aim of expanding the existing Inferred MRE at that deposit later this year.
· The Company believes there is excellent potential to increase significantly the size of the cumulative Resource across the Project.
Chief Executive Officer of Oriole Resources, Martin Rosser, said: "We are delighted to receive this maiden resource for the northern deposit on our Mbe licence in Cameroon. This together with the maiden MRE at MB01-S, brings our total resource to almost one and a quarter million ounces of gold at Mbe within the North and South area deposits, both of which are still open in all directions and at depth. For any gold exploration project reporting a more than 1 million oz contained gold deposit is a major achievement and Mbe continues to build upon its status as not only Cameroon's leading gold project, with highly encouraging potential to become a significant open pit gold mine but is also of a size that already bears favourable comparison with other major discoveries in Africa and the rest of the world.