Rig I presume there!12 Jan 2021 14:21
First thing they have to do is set up the generators. All connected to one another. Next thing set up the camp. Accommodation and mess hall. Water supply for all. Diesel available and pumpable depending on how cold it is. Then start building the rig.
They will have a map for where everything is placed to within feet. Lines connected and power and water main priority to accommodation for 70 people. Showers, water. Landry, Offices set up 4 minimum. Satellite system for internet.
Keep enough diesel on site and fresh water.
Build the rig and pick up pipe for derrick about 10. 000 feet. Drill a conductor top hole. Cement and then the fun begins
I reckon 10 days from here to spud.
ATB this time they will get it right> I have a Vision>