Enclosed17 Feb 2022 12:52
The derrick, drill floor and casing are all inside. So hopefully they get it down and cemented. Otherwise run drill pipe to bottom rotate slowly reciprocating the pipe and pump mud slowly. That keeps the mud warm and moving until the weather gets good enough