RE: Cleaning up23 Nov 2022 16:03
Sand screens are too late. End of that conversation. Gravel pack etc too late..
Just let them clean up. Basically like drilling the well again with Ct in tubing. The well is cased and perforated. The sand will be lying on the bottom of the horizontal for 5300 feet and building up at the elbow. Without killing the well they are trying to move sand with Maybe some mud for viscosity, Everyone calm down. My old problem was completion size from Angola to USA, there was this mind set of 2 7.8 and I think this is showing here.. Chevron 20 years ago listened to me and every completion after was minimum 3,5 and ended up at 5.