Casing 224 Nov 2024 13:52
My assumption was there was a wellhead on and 13 inch BOP above it. Principals are still the same. We are at 10, 000 feet. The casing shoe is at that depth. TVD is that so BHP is 5200 psi. Pressure test the casing against the BOP. Remove the cement head. Well is stable with the 2 barriers in place. The bottom of hole with cement and the hydrostatic of the mud.
Safe to lift the BOP. The casing is still all the way to the drill floor. Set a casing hanger which there are many different ones. Overpull the casing and set the hanger whilst stretching the cemented pipe. In the wellhead set the hanger. The Bop is sitting above the person setting it!!!! Slack off the weight to ensure it is taking the stretch. Cut the casing in the wellhead area. Blow torch or casing cutter. Lay that remnant down, Move the BOP OUT OF THE WAY. You now have to prep the stump for the next wellhead to go on. In that wellhead is a seal assembly that goes over the stump, Make up all the bolts and test the wellhead with a hydraulic hand pump. Usually 2 tests. This is massively important it is done properly. All good and put the BOP on again. Run a test plug and test the BOP again. More to follow. Rugby today, should be a good one!!