RE: Megrez.30 Jan 2025 14:01
The liner hanger will be set at above the surface casing shoe. The liner will have been run to depth and cemented. Remember they had a sump area at bottom. All they needed to cement the liner was a few hundred feet and leave the whole area above for testing from the bottom up!!! Tony and the guys will have worked out that cement job not to interfere with the perforating I would think. When they get back on the well run wireline and do a cement bond log to find where the top of cement is. Should be deep but does not matter. Will not be high though. Can perforate through cement if need be once completion is in and packer set.
Run completion and tubing hanger, Set the packer at about 4000 feet and can test all the formations back to that depth. Sealing off each test with cement and a plug. No reason they can not test everything. This is so well planned I can not believe it. I wish I was there David!!! LOL