As in 3 years AGO!! July 201925 Aug 2022 18:11
Gaz du Cameroun (GDC), a wholly-owned subsidiary of Victoria Oil & Gas (VOG), has signed a non-binding term sheet with Aksa Enerji Uretim (Aksa Energy) to supply up to 25 million standard cubic feet per day of gas for the latter’s proposed power station.
The 150MW power station will be built in Douala, Cameroon near the Bekoko substation, which is close to GDC’s existing gas pipeline network.
Earlier this month, Cameroon Minister of Water Resources and Energy, on behalf of the Government of the Republic of Cameroon signed a memorandum of understanding (MoU) with Aksa Energy to develop the power plant project.
Victoria Oil & Gas CEO Ahmet Dik said: “Considerable progress has been made in our Gas-to-Power strategy, as evidenced by the term sheet signed with Aksa Energy, one of the largest global independent power producers.
“Upon commencement, which is planned for late 2020, production levels would dwarf the current level of gas sales and propel VOG into a profitable trajectory of growth which has always been our aim.