How it works, for any new shareholder or anyone who may have missed it1 Apr 2021 10:19
"Feasibility studies and scoping prefeasibility studies were completed for development, geological study and mining operations at the following deposits:" -
"NKT and NYUD PGM occurrences, Monchegorsk ore district, Murmansk region, JSC Severo-Zapadnoye PGA."
http://www.tsnigri.ru/en/otdel-geologo-ekonomicheskoj-otsenki-mestorozhdenij.html
You'll note tsnigri mentioned in recent RNS yes?
When we got the MT flanks we got all that PFS info etc -
"Since the final approval of the Flanks licence (see RNS of 25 August 2020) the Company has been putting together the database of information from previous drilling campaigns in the Flanks area, that is considerable. 48,405m drilling (announced via RNS of 18 August 2020) is related only to one part of the Flanks License (NKT) and comes on the top of 33,100m drilled by Eurasia's Joint Venture with Anglo American Platinum. The Russian feasibility study on the NKT palladium dominant mine (within the boundaries of the Flanks License) gives 15% IRR at the palladium price of $659 per 1 oz, while the current palladium price stays above $2,000 per 1 oz due to long term structural deficit in the palladium market."
https://www.lse.co.uk/rns/EUA/interim-report-z4vq8goh3rc2usr.html
"Extensive prior drilling campaigns with c.48,000m drilled at NKT, a part of the Flanks application."
"Our predecessors also developed targets in the NKT area, and areas to the east of the Loipishnune deposit, and these work programmes in 2015-2017 resulted in pre-feasibility studies lodged with the State Cadastre of Mines in Russia."
https://www.lse.co.uk/rns/EUA/general-update-and-institutional-placing-at-225p-yh2uz9tcbjepr54.html
Eurasia run through the data, design the mine and get the EPCF contract in place like the original Sinosteel one.
Eurasia from that JV have access to the feasibility study that Rosgeo have just done -
"The Additional Assets have a total of 104.6 Moz Platinum equivalent resources as at 31.12.2020 (source: Russian Feasibility Study ("FS"), TsNIGRI, Russian State Cadastre of Mines) according to the Russian standards and are comprised of:"
So now they go through that data and plan the mines, get the EPCF contracts in place etc for the JV.
GLA