RE: PHE will be OK4 Feb 2026 12:54
(Paul Emmitt CEO, PHE Group said, “Waste is an ongoing issue in the UK, and as our landfills become full and we reduce the export of waste, PHE provides a solution to sit alongside the current energy from waste (EfW) infrastructure that can provide a low-emission alternative to fossil fuels”
The DMG® has been developed at a smaller scale to typical EfW facilities so that it can sit within and serve the municipalities in which the waste is produced, reducing transport of waste and the produced).
PHE need to make them in UK city Then PHE will go up a long way. You get rid of waste, and get power out.
loads