DRILLING RESULTS24 Nov 2021 18:39
Exactly 2 weeks until next update. Below is a summary of the reported position.
Since the 65k metre drilling program was announced 28 January, c. 72km has been drilled according to the 6/7-weekly RNS's.
Drill results to date:
RNS 10 Dec: 128,559m drilled for 134 holes
RNS 28 Jan: 138,504m drilled for 153 holes (*announced drilling campaign 65km)
RNS 11 Mar: 154,953m drilled for 179 holes (16,449m for 26 holes since 28 Jan)
RNS 29 Apr: 158,663m drilled for 183 holes (3,710m for 4 holes since 11 March)
RNS 10 Jun: 164,420m drilled for 190 holes (5,757m for 7 holes since 29 April)
RNS 22 Jul: 184,081m drilled for 212 holes (19,661m for 22 holes since 10 June) Note: 7 reported, 15 still in lab
RNS 9 Sep: 194,456m drilled for 230 holes (10,375m for 18 holes drilled since 22 July) Note All 18 still in lab though 12 of the 15 outstanding in 22 July update were reported on 9 September. So a total of 21 holes outstanding for report in October update.
RNS 28 Oct: 210,629m drilled for 254 holes (16,173m drilled for 24 holes since 9 Sep report). A further 24 holes drilled awaiting assay for report at next update hopefully.
Total drilled 28 Jan to 28 Oct: 72,125m for 101 holes. Average depth/hole = 720m.
The next set of results exactly 2 weeks from today should therefore be another bumper crop if the labs have caught up. Further growth drilling of course continues into 2022.
BYRNECUT ADVANCE
RNS 12 May: Commencement of decline
RNS 21 Jul: Advanced 69m
RNS 9 Sep: Advanced 120m (advanced 51m since previous update)
RNS 28 Oct: Advanced 211m (advanced 91m since previous update)
Byrnecut are picking up the pace nicely, currently averaging 2m/day. Expect that rate to rise again at next update.