Drilling Results: Summary9 Dec 2021 10:36
The Havieron joint venture has now completed a total of 219,561m of drilling from 266 holes, with all the latest completed holes continuing to intersect mineralisation, and 19 reporting significant mineralisation. Below is a summary of the reported position since drilling commenced.
Drill results to date:
RNS 10 Dec: 128,559m drilled for 134 holes
RNS 28 Jan: 138,504m drilled for 153 holes (*announced drilling campaign 65km)
RNS 11 Mar: 154,953m drilled for 179 holes (16,449m for 26 holes since 28 Jan)
RNS 29 Apr: 158,663m drilled for 183 holes (3,710m for 4 holes since 11 March)
RNS 10 Jun: 164,420m drilled for 190 holes (5,757m for 7 holes since 29 April)
RNS 22 Jul: 184,081m drilled for 212 holes (19,661m for 22 holes since 10 June) Note: 7 reported, 15 still in lab
RNS 9 Sep: 194,456m drilled for 230 holes (10,375m for 18 holes drilled since 22 July) Note All 18 still in lab though 12 of the 15 outstanding in 22 July update were reported on 9 September. So a total of 21 holes outstanding for report in October update.
RNS 28 Oct: 210,629m drilled for 254 holes (16,173m drilled for 24 holes since 9 Sep report). A further 24 holes drilled awaiting assay for report at next update.
RNS 9 December: 219,561m drilled for 266 holes (8,932m drilled since Oct report). A further 10 drill holes have been completed and are awaiting assay.
90,000 metres of Growth Drilling targeted to 30 June 2022.
Growth drilling continues to show potential for resource additions outside of the existing Inferred Mineral Resource, including a mineralised zone 100m below and 100m to the north-west of prior high grade holes.
All drilling now focused on growth programs to continue into FY22 with 8 drill rigs operational.
SD: "We are continuing to invest in the drill bit".
BYRNECUT ADVANCE
RNS 12 May: Commencement of decline
RNS 21 Jul: Advanced 69m
RNS 9 Sep: Advanced 120m (advanced 51m since previous update)
RNS 28 Oct: Advanced 211m (advanced 91m since previous update)
RNS 9 Dec: Advanced 245m @ 1 November
Byrnecut are picking up the pace nicely, currently averaging >2m/day. Expect that rate to rise again at next update - the quarterlies in January.