RE: Costs26 Jun 2025 10:18
Badomen, the original range was 115,000 to 120,000 tonnes.
Assuming in that range is acceptable, nobody asked what the acceptable level tonnage was, I asked too many questions, he answered three quarters of them, missed a few.
Later the plant manufacturers said it had been raised to 125,000 to 130,000 was achievable.
Obviously the whole purpose and aim of a mine as an abc is to produce at a viable level. Lower tonnage higher cost per tonne.
This is the crunch I have said it all along and as others have said who sit silently waiting have also posted.
Difficult to tell how much share drop at these times is the anticipation itself or outside influences. But I have seen lingering companies go very low before large multiples.
This is the crunch time.
Everything else known now irrelevant.