RE: Zeph22 Apr 2025 12:06
6th September rns
Now that the second test has been completed, the well has been temporarily shut in as per standard operations while Zephyr's operations team evaluates the new data. A key consideration is whether to produce the well in the short term, or to defer production temporarily in order to extend the wellbore and increase overall hydrocarbon recovery potential. While the well is capable of considerable production rates in its current form, it would be doing so from only a 130-foot completed interval which could make it more difficult to extend the well in the future by causing depletion in the near well bore area.
Basically they hit a small pocket before so hopefully this extension will get them into the main area