RE: Could be a leak17 Jul 2018 12:29
5 seperate targets, 1st at approximately 1000m
For Snow Leopard:
Drilling pace at 24/7 = 1226 Metres per week or 175 metres per day, whilst 12 hours per day only = 613 metres per week or 87.6 metres per day @ 7.3 metres per hour.
1st Target Top of the Turbidites at approximately 1000 metres, 2nd target at 1250 metres (Turbidites approx), 3rd target 20 mmbo at 1400 metres (approx), extra potential upside with 4th target at 1800 metres (approx) and last but not least top of 70 mmbo target at 2500 metres.
This is what I get with my limited software, like that of the back of a fag packet. Gives us a reasonable approximate guide anyway.
;)