RE: Steady drift3 Mar 2023 16:31
Incase anyone missed.......
The company is targeting annual production from the pilot plant of 50,000 tonnes of spodumene concentrate (SC6), though the CEO enthused in a November interview that this could technically reach 70,000 tonnes, with further capacity possible as modules are added. As Roach notes, βthe design capacity on the floatation circuit anticipates a mass pull of up to 30% at a design feed rate of 40 tons per hour of milled material. This represents a potential 12 ton per hour of spodumene rich concentrate.β
https://ukinvestormagazine.co.uk/premier-african-minerals-ftse-aim-miner-of-2023/