interims...yikes26 Sep 2013 22:57
Production for the first six months of the year averaged 199,984 m3/d of gas and 44 m3/d of condensate (1,525 boepd in aggregate) compared to average production of 214,470 m3/d of gas and 47 m3/d of condensate (1,636 boepd in aggregate) in the first half of 2012. Production from 1 July 2013 to 22 September 2013 averaged 181,357 m3/d of gas and 41 m3/d of condensate (1,388 boepd in aggregate). ...
The MEX-105 well did not produce hydrocarbons on test and has undergone a well stimulation programme, which included hydraulic jet perforation, but this programme was unsuccessful, and accordingly the well is being assessed as a candidate for hydraulic fracturing....
n light of the results from these wells, new geophysical studies are being undertaken, which together with the results of future wells and the well stimulation programme, may cause the Group to consider revising the current field development plan, which in turn may result in a reduction in the carrying value of the Group's oil and gas development and producing assets in Ukraine.