RE: SJ update rumour13 May 2024 20:07
I previously suggested flow testing of mou 4 before mou 5 is drilled.
If the carbonates fail to flow gas, then don’t drill mou 5, so a cheapie risk.
In addition, a flow test may help establish a gas water or gas condensate contact , important .
The shallower reservoir horizon,was initial reported as being with elevated gas shows, but was then not listed as a priority for flow testing in the itr , then highlighted recently as gas bearing by nuetech.
The priority needs to be flow testing , which then strengthens prd negotiations with alleged 3rd party acquirers.
Jimmy