NCCL10 Dec 2021 08:00
· Study reviewed a number of potential transmission integration solutions following discussions with EDM
· Each was optimized for cost, capacity on existing infrastructure and, for new infrastructure, timing of delivery
· Preferred integration point is 40 km from the Project
· Potential for a closer integration point in the future