RE: Excitement Builds for Horse Hill Development19 Jul 2023 14:23
You did read the RNS didn't you?
"four (4) potential oil production wells"
"bringing the Chalk Talk #1H and #4H wells back online, flow testing the Whistling straits 5H well and potentially bring back online the 100% owned City of Gonzales #1 (COG #1) well that Pennpetro was forced to shut in over the Covid period."
""Chalk Talk wells initial production rates ranged from 100-400 barrels of oil per day, so we are optimistic that we could see the Chalk Talk #1H and #4H wells providing PPP with some good oil production numbers in future."
We all know initial flow rates are far higher than those after a few years.
""As we previously reported, Millennium, the previous Operator of Whistling Straights #5H well unsuccessfully installed a jet pump to clean up the well and until now has yet to recover all the load water used during drilling and completion, from the well. "
Still ongoing after 3 months.
The grass doesn't normally turn out greener from my memory.