RE: Been looking at things30 Nov 2018 12:07
Why not post it all?
"Three parish councillors were invited to meet the consultant working with Angus
Energy to give us an update on the developments on the site.This also gave us an
opportunity to ask some pertinent questions. They are planning to carry out a ` workover` of well BRX4Z. They have permission to install a 95 foot rig but consider that a 55 foot one will do the work which will put in tubing for testing. This is due to start at about the end of the month and probably last for about four weeks. Other plant and equipment will be brought in. There could be some emergency flaring off but this will be contained in some shrouding that will also be installed. This was in the planning application and approved by Surrey County Council ( SCC). Angus Energy must notify SCC and surrounding residents 7 days before the workover takes place. A leaflet will be delivered to Old School Lane and other roads close to the site. Answers to some of the questions included the following : a lot of the gas produced will be used to generate electricity on the site. Excess will be connected to the grid once a cable is in position and some released as emergency flare off. All water generated from the Brockham site will be re injected and none sent off site. There will definitely not be any fracking on this site. After the appraisal of the well is completed, Angus Energy will invite SCC, MVD representatives, Health and Safety and the parish council to a meeting where their engineers will give a presentation and explanation.This will be approximately 6 months after the appraisal has been completed. The indication was that it could be around March or April. We have asked that at that time a liaison committee should be set up to monitor events over the following months and we will also be requesting that Brockham Oil Watch should have representation."