When you are the operator2 Jul 2021 13:34
you can let PI's know what is going on.
"UK Oil & Gas Investments PLC (London AIM and NEX: UKOG) announces that 13? inch steel casing was set and cemented successfully over the 855 feet thick Weald Clay section on its 100% interest Broadford Bridge-1 ("BB-1") Kimmeridge Limestone exploration well. Directional drilling operations, within 12¼ diameter hole, commenced on Monday evening. BB-1 has now reached a depth of over 370 metres (1200 feet) below surface within the Lower Cretaceous Hastings Beds. The uppermost Kimmeridge Limestone target, KL4, is expected to be conventionally cored in around 10-12 days' time. The well remains on schedule and within budget."
When you are not you have to guess. You can work out from the old RNS's what the drilling rates were. The ones pushed out so far are way off but that is to be expected.