RE: Bulls eye Turkey coming.14 Aug 2022 07:23
It is not stopping the National O&G company.
"Energy Diary - Natural gas will be searched in Lüleburgaz district of Kirklareli. In this context, TPAO will drill a borehole named Erikleryurdu-1.Natural gas exploration and extraction activities are planned by the Turkish Petroleum AO Thrace Regional Directorate at a point within the borders of Lüleburgaz District in Kirklareli Province AR/TPO/K/E18-C4 license area. The value of the project is estimated at approximately 1 million liras.Within the scope of the project, natural gas will be sought through the borehole named Erikleryurdu-1, which will be drilled in an area of ??17 thousand square meters. The well drilling will go down to a depth of 1000 meters. The cracking method will not be applied at the drilling points. If natural gas is found in the area, extraction works will be carried out. In the light of the studies carried out before drilling, it is estimated that a maximum daily production of 100,000-150,000 m3 can be made from the well. "
Canadian Thrace Basin Natural Gas Co. company will search for natural gas by drilling two boreholes in the Hayrabolu district of Tekirdag.
Thrace Basin Natural Gas (Turkey) Co., a subsidiary of Canadian Valeura Energy. Turkey Ankara Branch is planning to explore natural gas within the license area of ??AR/TGT-PIN-STT/K/F18-D1, D2, D4, which is located in Bayramsah and Kahya neighborhoods of Tekirdag's Hayrabolu district, covering a total area of ??35,788 hectares.
Within the scope of the project with a cost of approximately 3 million liras, when sufficient gas signs are seen in the well, the casing pipes will be lowered and cemented. After the cement has dried, appropriate wellhead equipment will be installed and the site will be delivered to the Well Completion team. If there is not enough gas in the well, the location will be collected by closing the well in accordance with the Petroleum Law and Environmental Laws and Regulations. "
I guess your brother is wrong.