Siting drill pads23 Apr 2022 17:44
The last round of holes to test southern extension to RC ( ) were sited using historical IP. It was later confirmed with interim results from the latest lines, that the drill pad positions were sub optimal. Also, the recent pads we are awaiting approvals for, were also sited using historical data.
In an ideal world, pads would be sited for optimum use using the very latest quality survey at the beginning of an exploration phase.
Question being, is the positioning of a pad, although important, not that critical, example being, the drill hole positions map show all are pinpointed on the fringes of woodland, along rides or in clearings, or, was the more inferior historical IP used to progress exploration quicker to help fulfil CB’s aggressive timescale? At some detriment to potentially better drill results through more optimal positioning of pads if they had run the latest lines sooner and before pad applications were submitted?
The latest round is needed to produce the final model though, as well as aid the more accurate targeting of holes, angle and orientation when the drone mounted EM data is overlayed. (Would assume they are still using it) So maybe it was also necessary to do the new lines of IP as the historical wasn’t adequate enough to work alongside the drone’s EM for targeting.
All very interesting