RE: European Ferro Tungsten Price6 Mar 2019 22:10
I get that, but the target is 2400 tonnes of tungsten concentrate 66 or 65% per annum from T2. We get the ratio price of APT. The same applies to our tin concentrate which I believe will be in the high 50s ( I don’t know the Tin smelting ratio) it’s always possible the plant will get to even higher output rates, but configurating these processes take time, practice, patience and methodical logging of learning to achieve optimal performance.. lets hope allmineral are a damm sight more slick at commissioning than expediting Simple sectional steelwork with a few holes drilled in !