Pikka b and Pikka c17 Feb 2019 20:46
jndavid490, maestro was indeed correct. Oilsearch, Repsol and Armstrong consortium are presently drilling 2 appraisal wells testing the Nanushuk formation.
The first Pikka b was drilled with yet another commercial success, this well is now being sidetracked.
Pikka c was spudded on 23 jan 2019 and news should be due anytime.
Well Name Well Type
Location
Spud Date Rig
Objective/ Target
Status
Pikka B Appraisal
Pikka Unit, Alaska North Slope
31 December 2018 Doyon Arctic Fox
Cretaceous Brookian Sandstone (Nanushuk). The objective of Pikka B is to constrain the potential resource volumes in the field.
During the month, the Pikka B well penetrated the target Nanushuk Formation and encountered hydrocarbons, in line with pre-drill expectations. Coring and processing of 146 metres (480 feet) of Nanushuk 3 sand and six open-hole logging runs were completed successfully. Early interpretation of the cores indicates a hydrocarbon-saturated, high porosity sand.
After drilling to a total depth of 1,476 metres (4,844 feet), the wellbore was plugged and abandoned, as planned, and a side-track kicked off.
PIKKA UNIT
Nanushuk Fairway
ALASKA ANCHORAGE
KUPARUK RIVER
ALPINE
OSH Development
OSH Exploration
Pikka B
Operator Participants
Oil Search
Oil Search (Alaska) LLC
Repsol E&P USA, Inc. Armstrong Energy, LLC
GMT Exploration Company, LLC Total
25.5% 49.0% 19.1%
6.4% 100.0
Well Type
Location
Spud Date Rig
Objective/ Target
Status
Operator Participants
Pikka B ST1 Appraisal, sidetrack
Pikka Unit, Alaska North Slope
23 January 2019 Doyon Arctic Fox
Cretaceous Brookian Sandstone (Nanushuk). The objective of Pikka B ST1 is to constrain the potential resource volumes in the field.
During the month, a side-track well was drilled from the Pikka B well to a depth of 1,027 metres (3,370 feet), at a 71-degree angle from the original Pikka B wellbore.
The forward plan is to drill into and core the Nanushuk 3 sands, before conducting a well test.
PIKKA UNIT
Pikka B
KUPARUK RIVER
ALPINE
OSH Development
OSH Exploration
Oil Search
Oil Search (Alaska) LLC
Repsol E&P USA, Inc. Armstrong Energy, LLC
GMT Exploration Company, LLC Total
25.5% 49.0% 19.1%
6.4% 100.0%
Well Name Well Type
Location
Spud Date Rig
Objective/ Target
Status
Pikka C Appraisal
Pikka Unit, Alaska North Slope
23 January 2019 Nabors 105E
Cretaceous Brookian Sandstone (Nanushuk). The objective of Pikka C is to reduce uncertainty on well deliverability by drilling a “proof of concept” development-type well.
Drilling commenced on the Pikka C well on 23 January 2019 and at the end of January, was at a depth of 675 metres (2,215 feet). Surface casing was set and cemented.
The forward plan is to drill through to the Nanushuk formation, evaluate, then drill a side- track to build a lateral section in the reservoir. The well will then be completed and flow- tested.
PIKKA UNIT
Nanushuk Fairway
ALASKA ANCHORAGE