Expected timings for ASH 4...4 Nov 2022 15:30
ASH 1 information is not easy to find so looking at ASH 2 and 3.....
ASH-2 well
ASH 2 was produced from 2 formations.
Following the announcement on 20 December 2019, issued pursuant to media reports in Egypt, ASH-2, which was drilled to a total depth of 4,030m in the Alem El Buieb (AEB) Formation, has been completed to allow selective production from both an upper and lower reservoir interval. The upper and lower intervals were tested separately at maximum gross rates of 7,027 and 3,851 bopd respectively. It took 12 days to stabilize, but this information was reported after around 20 days....
ASH-2 came on stream on 2(nd) January and has been consistently producing at over 3,000 bopd (660 bopd net to Rockhopper's 22% interest) on a 32/64" choke. The well will continue to be monitored over the coming months, and during this period, the interpretation of the test data and the longer-term planning for the ASH field-development will continue with the joint venture partners and Egyptian General Petroleum Corporation ('EGPC'). The rig is currently being mobilised for the first well in the 2020 infill programme (El Salmiya 5) which is expected to spud shortly.
ASH 3..
This information was reported after 8 days
Highlights
-- Preliminary results from the ASH-3 well-test indicate a maximum flow rate of 6,379 bopd and 6.7 mmscf/d (c. 7,720 boepd gross; 1,700 boepd net) from the Alam El Bueib ("AEB") reservoir during well-testing on a 64/64" choke
-- On a reduced, 30/64" choke, expected to be more representative of the producing flow rates, the well flowed at 3,561 bopd and 2.9 mmscf/d (c. 4,140 boepd gross; 910 boepd net)
-- The well is expected to be brought onstream in the coming days
We are on day 8 post ASH 4.
Next week looks highly likely unless there are multiple intervals to test.