RE: Georgia6 Sep 2019 13:23
Hi Guys,
From the last RNS:
"The Company will draw on the valuable experience gathered from the drilling of well 16aZ to optimise the completion design for well 38Z. "
This sounds to me, like there's a problem with casing gas. (Which can reduce the barrels of fluid flow by upto 80% & cause stoppage jams) it can be overcome with workover installing casing gas compressors. If this is the case, they would alter the completion design, to incorporate casing gas compressors.
They should be Spudding soon.
Good Luck All Shareholders.