RE: Lithium soaring & big resource upgrade soon1 Feb 2022 14:13
I will hold until the San Domingo drill results are out. Preliminarily, the CEO has said it has a 9km strike whereas Lionstown - Kathleen Valley has a 1.5km strike. Kathleen Valley owned by Lionstown is a 2.2 Billion USD asset. The CEO has implied San Domingo COULD BE, 8 times longer and the depth we know goes beyond 80metres. It the strike is longer and at least 100 metres deep then we could get a massive rerate on that alone. Hard Rock is easier to mine too. I bought at intervals between 9p and 15p.