Breakdown13 Oct 2023 13:00
Somewhere in here most likely the root of the problem!
Well Service Transmissions
CX35-P800
Overview
Your operation depends on the power driving it. And your transmission is as crucial to your power solution as the engine. Cat transmissions are proven in the oil and gas industry and widely known for their exceptional power, leading durability, ease of operation, and shifting options.Ideal applications for Cat CX35-P800 transmissions include workover rigs, hydraulic fracturing, kill mud pumps, coil tubing pump support, nitrogen units, acidizing units, and cementing units. CX35-P800 transmissions are optimized for use with C15 ACERT, C18 ACERT, and C27 ACERT engines (A ratings).Cat CX35-P800 oilfield transmission. Gross input power: 597 bkW (800 bhp). Configurations available include basic and integral pump drives.
CX35-P800 STANDARD EQUIPMENT
CAT ENGINES FOR OPTIMIZED POWER TRAIN
C15 ACERT, C18 ACERT, and C27 ACERT (A ratings).
TRANSMISSION ROTATION
Input rotation β counterclockwise
Output rotation β counterclockwise(as viewed from rear)
TORQUE CONVERTER
Lock-up clutch, torque converter drive in all gears integral to transmission
Stall torque ratio - 1.962
CLUTCHES
Clutches β electro-hydraulic fully modulated, oil cooled, multidisc
Clutch modulation control β Cat Electronic Clutch Pressure Control (ECPC)
INSTALLATION CONNECTIONS
2 oil cooler lines
1 electrical connector
OIL SYSTEM
Cat Transmission/Drive Train Oil-4 (TDTO)
Sump oil temperatures
Maximum converter outlet oil temperature β 250Β°F (121Β°C)
Hydraulic fill capacity β 9 gal (34 L), 16 gal 61L) initial fill
Direct mount filter
MOUNTINGS
Input (flywheel) β SAE #1 dry flywheel housing
Side supports β two SAE #2 pads
Output β 1810 yoke, 1810 companion flange, SPL 250 yoke, ISO 8667-T180 flange
POWER TAKE-OFF DRIVES
Location
Mounting type: 10 bolt
Rated torque
Rotation: same as engine
Ratio, 1:1
Our Predator will most likely have a n older configuration to the above but the concept is the same.
Power Take Off will provide the link to the Hydraulic Pump to then feed the Drill Bit Drive Auget Motor, the Mast Rams, Pipe Skate Rams for set up and levelling on site.
Testing under no load today.
Start running under light load tomorrow and Sunday, then back to full work drilling and RNS on Monday.
In a perverse way, the downtime will have given a great opportunity to go through all the other parts of the Rig, check welds, filters, hoses, fuel line fractures, etc.
Almost like a second Audit.
So not all bad!
Time to get this Discovery done now!