Drilling Updates6 Mar 2026 03:23
While reiterating I want CMRS to succeed, CL should be able to see some possible reasons for SP fall & stagnation at these levels.
I understand that bad weather has been experienced but the Sp unfavourable actions have been ongoing.
==
When drilling started in Sep. I was impressed with the prep of 50 drill pads and the readiness to drill,
and CL saying that they could drill one shall hole a day, but maybe 2 days for a deeper hole; and allow for reposition of drill rig.
In first set of results, RNS stated 20 holes drilled in what seemed the first month. I believe this was 1 rig with 1 shift per day.
Fast fwd to near present time and CMRS scheduling 20 holes per month with 2 teams and 2 shifts per day. Is this correct? as RNS is not clear. 20 holes per month or 20 holes per month each rig?
Whichever way, whilst ramping up drilling, it does not seem to be like the acceleration stated.
Subj. RNS now stating abt MRE 26Q3, when before it was late 26Q1 early Q2, so more slippage.
Is it CMRS getting a 3rd rig from the contractor??? Is the rig ready and fit for purpose???
I do wonder about drilling contractor operational performance based on previous videos n some RNS info,
and realize that the drilling contractor is "training" CMRS Drill Team.
Meantime, whilst RNS drill results are welcome and appear truthful, the info re: 20 holes per month n hitting mineralization
in 60% of holes is not encouraging. So 12 holes a month have mineralization, So it could be said that for half of the month
= nada.
Looking fwd to improved drill performance and results.
GLA